FAA Small Airplanes Issues List
Small Airplanes Product Issues List
Q3 2026 · 30 September 2026 Source checked 2026-11-28
Scope, source and reading notes
Certification planning issues for domestic projects. Consult the applicable bilateral agreement for validation projects. Entries summarize issues and do not reproduce the underlying project issue papers. Public issue summaries only; complete project issue papers are not reproduced.
Aerospace Consulting reference note: Public certification topics that may require special conditions, agreed means of compliance or FAA coordination.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view. This is the FAA’s public summary of certification issues, not the full project issue papers.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 62751f1b8c1bedde2c69ffaeb2a9164653f8b95bb1349c12e16e00532257ddcc
A-1710 Small Airplane Systems and Equipment
Real Time Parameter Identification Systems
Standardization Item: If the applicant proposes to use Real-Time Parameter Identification Systems, then they must coordinate their proposals with the FAA to determine the level of FAA involvement with respect to policy and guidance. Real-Time Parameter Identification Systems are non-deterministic systems used to mathematically model something in real-time and are new to the Part 23 fleet. The FAA is actively working on draft policy and guidance for the use of this new and novel technology.
A-0502 Small Airplane Electrical Systems Battery - Rechargeable Lithium/Battery Systems Installation
If the applicant is seeking approval of Rechargeable Lithium Batteries (RLB) and/or battery system(s) installations on a 14 CFR part 23 airplane, then the following are needed: ⦁ A Means of Compliance (Means OC) Certification Position Paper CPP-23.2525-2 that provides Safety Objectives (SOs) to address the installation of rechargeable lithium batteries when showing compliance to 23.2525 (amendment 23-64 and after). Applicants may use this CPP by referring to it in their project specific certification plan. ⦁ A Method of Compliance (Method OC) CPP-23.2525- 3 which establishes a method of compliance with the requirements of CPP-23.2525-2 as statated above. Applicants may use this CPP by referring to it in their Project Specific Certification Plan. If the applicant deviates from these CPPs, a Means and/or Methods of Compliance Issues Papers(s) will be required. For 14 CFR Part 23 airplane projects, 14 CFR part 23 amendment 64 or later regulations applicable to RLB and/or battery system(s) installations must be used to avoid the need of issuing special conditions. Note: Draft Advisory Circular 20-184A is not to be used for 14 CFR part 23 airplane.
A-0503 Small Airplane Electrical Systems Battery - Non- Rechargeable Lithium/Battery Systems Installation
If the applicant is seeking approval of Non-Rechargeable Lithium Batteries (NRLB) and/or battery system(s) installations on a 14 CFR part 23 airplane, then the following are needed: ⦁ A Means of Compliance (Means OC) Certification Position Paper CPP-23.2525-1 that provides Safety Objectives (SOs) to address the installation of non-rechargeable lithium batteries when showing compliance to 23.2525 (amendment 23-64 and after). Applicants may use this CPP by referring to it in their project specific certification plan. ⦁ A Method of Compliance (Method OC) CPP-23.2525- 4 establishes a method of compliance with the requirements of CPP-23.2525-1 as stated above. Applicants may use this CPP by referring to it in their project specific certification plan. If the applicant deviates from these CPPs, a Means and/or Methods of Compliance Issue Paper(s) will be required. For 14 CFR Part 23 airplane projects, 14 CFR part 23 amendment 64 or later regulations applicable to NRLB and/or battery system(s) installations must be used to avoid the need of issuing special conditions. Note: Draft Advisory Circular 20-192 is not to be used for 14 CFR part 23 airplane.
A-0504 Small Airplane Electrical Systems Battery - Storage Battery Standardization Item: If the applicant proposes to use an aircraft electrical system design that has the storage battery being used as starter power and emergency power, then they may require an Equivalent Level of Safety (ELOS) finding at amendment 23-63 or earlier to comply with 14 CFR 23.1353(h). Per this design, the aircraft must use the same battery that is used for engine starting as well as to meet the 30 emergency minute requirement. At amendment 23-64 and after, applicants should incorporate FAA accepted means of compliance (MOC) into certification planning in lieu of an ELOS finding.
View figures, tables and original page layout

