MOC-4 SC-VTOL
Means of Compliance with SC-VTOL — Batch 4
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 4 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Fourth final batch, introducing further means of compliance and amendments to previous MoC publications.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: d66389491b058ad129efdb1faa6d7d29a1a2bc2bf70dda5612bd6b3f53e2d321
Doc. No: MOC-4 SC-VTOL Issue: 2 Date: 11 July 2025
Fourth Publication of Means of Compliance with the Special Condition VTOL
MOC VTOL.2270 (c) Seats, berths, safety belts, and harnesses
CS 27.785 Amdt. 6 is accepted as a means of compliance with regards to seats, berths, safety belts, and harnesses providing protection for occupants in the VTOL aircraft.
The applicability of the content of paragraphs CS 27.561, CS 27.562 and CS 27.625 referenced therein shall be understood as laid out in MOC VTOL.2270 (a) and (c), in MOC VTOL.2270 (b)(1), and in MOC VTOL.2265, respectively.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-4 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source