MOC-4 SC-VTOL
Means of Compliance with SC-VTOL — Batch 4
Issue 2 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 4 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Fourth final batch, introducing further means of compliance and amendments to previous MoC publications.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: d66389491b058ad129efdb1faa6d7d29a1a2bc2bf70dda5612bd6b3f53e2d321
Doc. No: MOC-4 SC-VTOL Issue: 2 Date: 11 July 2025
Fourth Publication of Means of Compliance with the Special Condition VTOL
Acceptable interpolation and extrapolation criteria of flight test data for the altitude and temperature effects should be agreed with EASA.
(b) Mass and Centre of Gravity (CG)
The applicant should establish the performance for the most critical combination of mass and CG, including lateral CG (if affecting performance). The applicant should determine the most critical CG condition for each performance data, which may vary depending on the VTOL design. Mass should span from the minimum mass up to the maximum mass as defined in VTOL.2100.
(c) Wind conditions
Wind conditions can significantly affect airfield performance (e.g. take-off and landing distances and climb gradients…) and hovering at h1 and h2. Therefore, when determining this performance, the applicant should take into account the wind conditions for which certification is required. The following chapters/paragraphs aim at providing guidance for Enhanced and Basic Category for airfield and minimum performance. For additional guidance on the wind effects on climb and hovering performance see also MOC VTOL.2125.
Category Enhanced
(i) The airfield performance and the minimum performance data should be developed with the most critical wind condition for which certification is sought. When limitations to the wind intensity and azimuths are proposed to reduce the number of allowable wind conditions (e.g. no tail winds on take-off), the proposed limitations should be operationally feasible. In addition:
(A) In case of a Conventional Take-Off (ConvTO) (see MOC VTOL.2115) or a Conventional Landing (ConvL) (see MOC VTOL.2130), the applicant should select a maximum crosswind component not less than the highest of 0,2 VTOSS and 0,2 VREF. This maximum crosswind condition should be demonstrated by flight test (B) In cases other than (A), the take-off and landing mass cannot be higher than the mass established to ensure controllability in accordance with SC VTOL.2135 (a)(6). However, the effect of crosswind on take-off and landing procedures should be assessed through flight test to confirm that the proposed procedures can be flown without requiring exceptional piloting skill.
Category Basic
(i) When determining the minimum performance, the applicant may refer to still air and ISA sea level conditions (see VTOL. 2105 (a)(1)). In order to provide a set of operationally relevant data, the applicant is encouraged to determine the minimum performance considering wind limits appropriate for the intended operations. (ii) The airfield performance should be developed considering the most critical wind condition for which certification is sought.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-4 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source