EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-189

The Management of Open Problem Reports (OPRs)

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Management and assessment of open problem reports; includes GM1, GM2 and GM3.

Aerospace Consulting reference note: Explains the evaluation, classification and disposition of open problem reports in the certification process.

Complete selected AMC and associated material, from PDF pages 583–591 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 586 · PDF page 586

6.4 Reporting: an OPR summary report should be prepared and provided to the affected stakeholder(s), and to the certification authority upon request. The OPR summary report may be an aggregation of summaries (e.g. Software/Hardware Accomplishment Summaries or system-level OPR reports) prepared by all the involved stakeholders. The summary report should provide access to the following information for each OPR:

6.4.1 The identification of the OPR (for example, the OPR ID);

6.4.2 The identification of the affected configuration item(s) (for example, the item part number,

component name, artefact name) or of the affected process(es);

6.4.3 Title or a summary of the problem, formulated in a manner understandable by the affected

stakeholder(s);

6.4.4 Description of the problem, formulated in a manner understandable by the affected

stakeholder(s);

6.4.5 The conditions under which the problem occurs;

6.4.6 The OPR classification and assessment results (per Sections 6.1 and 6.2), including:

1. for each OPR, regardless of its classification:

a. the classification of the OPR, and

b. the relationships that are known to exist with other OPRs;

2. for OPRs classified as ‘Significant’:

a. a description of any mitigations or justifications used to substantiate the acceptability of the OPR safety effect (per Section 6.3), and

b. the functional limitations and operational restrictions, if any;

3. for OPRs classified as ‘Functional’:

a. a description of any mitigations or justifications used to reduce the safety effect to Minor or No Safety Effect, and

b. the functional limitations and operational restrictions, if any;

4. for OPRs classified as ‘Process’, a description of the extent or nature of the process non- compliance or deficiency that might contribute to not satisfying the applicable development assurance objectives; and

5. for each OPR not classified as ‘Significant’ or ‘Functional’, the justification that the error cannot have a safety or functional effect.

6.5 ETSO specifics: The ETSO authorisation holder may exclude from the reporting process (per Section 6.4) any OPRs classified as ‘Process’ or ‘Life-cycle data’ that are not necessary for the installation approval. However, all OPRs should be available upon request by the certification authority for assessment in the frame of the ETSO approval.

7. STAKEHOLDER RESPONSIBILITIES

The levels of stakeholders include: item, equipment or ETSO article, system and product. The actual stakeholders for a specific project depend on the project organisation.

7.1 The levels of stakeholders include: item, equipment or ETSO article, system and product. The actual stakeholders for a specific project depend on the project organisation.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-189

Related technical context

Engineering context
Evidence and scope

AC 20-189 and AMC 20-189 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.