EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-189

The Management of Open Problem Reports (OPRs)

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Management and assessment of open problem reports; includes GM1, GM2 and GM3.

Aerospace Consulting reference note: Explains the evaluation, classification and disposition of open problem reports in the certification process.

Complete selected AMC and associated material, from PDF pages 583–591 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 587 · PDF page 587

7.2 OPR management (per Section 6) should be performed, at a minimum, at the ETSO article level, at the level of each individual system within a product, and at the product level.

8. RELATED REGULATORY, ADVISORY AND INDUSTRY MATERIAL

(a) Related EASA Certification Specifications (CSs)

(1) CS-23, Certification Specifications and Acceptable Means of Compliance for Normal Category Aeroplanes

(2) CS-25, Certification Specifications and Acceptable Means of Compliance for Large Aeroplanes

(3) CS-27, Certification Specifications and Acceptable Means of Compliance for Small Rotorcraft

(4) CS-29, Certification Specifications and Acceptable Means of Compliance for Large Rotorcraft

(5) CS-E, Certification Specifications and Acceptable Means of Compliance for Engines, and AMC 20-3A, Certification of Engines Equipped with Electronic Engine Control Systems

(6) CS-P, Certification Specifications for Propellers, and AMC 20-1, Certification of Aircraft Propulsion Systems Equipped with Electronic Control Systems

(7) CS-ETSO, Certification Specifications for European Technical Standard Orders

(8) CS-APU, Certification Specifications for Auxiliary Power Units, and AMC 20-2A, Certification of Essential APU Equipped with Electronic Controls

(b) EASA Acceptable Means of Compliance (AMC)

(1) AMC 20-115( ), Airborne Software Development Assurance Using EUROCAE ED-12 and RTCA DO-178

(2) AMC 20-152( ), Development Assurance for Airborne Electronic Hardware

(c) FAA ACs

Refer to latest version.

(1) AC 20-115( ), Airborne Software Development Assurance Using EUROCAE ED-12( ) and RTCA DO-178( )

(2) AC 20-152( ), Development Assurance for Airborne Electronic Hardware

(3) AC 27-1309( ), Equipment, Systems, and Installations (included in AC 27-1, Certification of Normal Category Rotorcraft)

(4) AC 29-1309( ), Equipment, Systems, and Installations (included in AC 29-2, Certification of Transport Category Rotorcraft)

(d) Industry Documents

(1) EUROCAE ED-12, Software Considerations in Airborne Systems and Equipment Certification, dated May 1982 (no longer in print)

(2) EUROCAE ED-12A, Software Considerations in Airborne Systems and Equipment Certification, dated October 1985 (no longer in print)

(3) EUROCAE ED-12B, Software Considerations in Airborne Systems and Equipment Certification, dated December 1992

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-189

Related technical context

Engineering context
Evidence and scope

AC 20-189 and AMC 20-189 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.