EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-152A

Development Assurance for Airborne Electronic Hardware (AEH)

AMC 20-152A · introduced by Amendment 19; consolidated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Hardware development assurance for airborne electronic hardware, including custom devices and commercial off-the-shelf devices.

Aerospace Consulting reference note: Explains EASA expectations for airborne electronic hardware development assurance and the use of ED-80/DO-254. Includes the complete current AMC in the Amendment 23 consolidation.

Complete selected AMC and associated material, from PDF pages 497–517 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 509 · PDF page 509

The verification strategy may combine different means to complement the traditional requirements- based testing approach.

Based on the applicant’s assessment of the IP provider and the IP data through Objective IP-2, the applicant is expected to establish a verification strategy. The aim of this verification strategy is to cover all three of the following aspects:

— The COTS IP: the purpose is to ensure that the COTS IP is verified, addressing the risk identified from the IP-2 Item 3 objective;

— Its implementation: the purpose is to ensure that the COTS IP still performs its allocated function, and that no design errors have been introduced by the design steps performed by the applicant (e.g. synthesis/place and route);

— Its integration within the custom device: the purpose is to ensure that the COTS IP has been properly connected, configured, and constrained within the custom device.

The strategy may accomplish more than one aspect within a common verification step.

This section identifies a general objective for the verification of COTS IP used in a custom device, enabling various verification approaches.

Objective IP-4

The applicant should describe in the hardware verification plan, PHAC, or any related planning document, a verification strategy that should encompass all three of the following aspects:

1. The verification of the COTS IP itself, addressing the risk identified from the IP-2 Item 3 objective;

2. The verification of the COTS IP after the design steps performed by the applicant (e.g. synthesis/place and route);

3. The verification of the integrated COTS IP functions within the custom device.

Note 1: Reliable and trustworthy test data, test cases or procedures from the COTS IP provider may be

used as part of the verification strategy to satisfy this objective.

Note 2: If the COTS IP implements functions based on an industry standard, proven standardised test

vectors verifying compliance with the standard may be used in the verification strategy of the COTS IP.

Note 3: The verification strategy covers at a minimum the used functions of the COTS IP and ensures

that the unused functions are correctly disabled or deactivated and do not interfere with the used functions.

5.11.3.3.3 COTS IP and Planning Aspects

The applicant has to define the activities that are needed for the hardware development assurance approach related to COTS IP.

Objective IP-5

The applicant should describe in the PHAC, or any related planning document, a hardware development assurance approach for using the COTS IP that at least includes:

1. identification of the selected COTS IP (version) and its source format(s) associated with the point(s) in the design flow where the COTS IP is integrated into the custom device;

2. a summary of the COTS IP functions;

3. the development assurance process that the applicant defines to satisfy the objectives of Section 5.11.3;

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

EUROCAE ED-80

Recognises this edition

Source-backed
Evidence and scope

AMC 20-152A §1.2

Names ED-80, April 2000.

AEH; AMC applicability and supplementary objectives remain relevant.

Supporting source
RTCA DO-254

Recognises this edition

Source-backed
Evidence and scope

AMC 20-152A §1.2

Names DO-254, 19 April 2000.

AEH; AMC applicability and supplementary objectives remain relevant.

Supporting source
AMC 25.1309

Referenced by AMC 25.1309

Source-backed
Evidence and scope

EASA CS-25 Amendment 28 consolidated publication AMC 25.1309 §3(a)(5), p858; EASA CS 25 Amendment28 change information AMC 25.1309 §3(a)(5), p88

Explicitly references AMC 20-152A for airborne electronic hardware assurance. Corroborates the addition/reference of AMC 20-152A; change markup must not be presented as consolidated source text.

Read the cited document’s applicability and the project certification basis.

Supporting source
CS-25

Lists this CS family

Source-backed
Evidence and scope

AMC 20-152A §8(a)(2)

Lists CS-25 without an amendment or specific paragraph.

Family reference; does not select a certification basis.

Supporting source
AC 20-152A

Related FAA guidance

Engineering context
Evidence and scope

AMC 20-152A §8(b)(1); AC 20-152A §8.3

The AMC cites AC 20-152 without a suffix; the AC cites AMC 20-152(). Pairing these selected editions is editorial.

Comparable subject; no claim of blanket equivalence or automatic mutual acceptance.

Supporting source
CM-DASA-002

Referenced by memorandum

Source-backed
Evidence and scope

EASA CM-DASA-002 Issue 01 FINAL §1.1, p5

Item-level software/hardware and the safety-assessment process itself are excluded; AMC 20-115D and AMC 20-152A are referenced. Safety-process interfaces remain in scope.

Read the cited document’s applicability and the project certification basis.

Supporting source
ARP4754A

References this edition

Source-backed
Evidence and scope

AMC 20-152A §8(c)(4)

Lists ARP4754A with the dated edition shown in the source.

Related industry-material citation, distinct from the ED-80/DO-254 recognition in §1.2.

Supporting source
ED-79A

References this edition

Source-backed
Evidence and scope

AMC 20-152A §8(c)(1)

Lists ED-79A with the dated edition shown in the source.

Related industry-material citation, distinct from the ED-80/DO-254 recognition in §1.2.

Supporting source
ARP4761

References this edition

Source-backed
Evidence and scope

AMC 20-152A §8(c)(5)

Lists ARP4761 with the dated edition shown in the source.

Related industry-material citation, distinct from the ED-80/DO-254 recognition in §1.2.

Supporting source

Copy reference

Select and copy the citation below.