Scope, source and reading notes

Airborne software development assurance; includes GM1, GM2 and GM3 to AMC 20-115D.

Aerospace Consulting reference note: Guidance for airborne software development assurance using ED-12/DO-178 and associated supplements, with the related guidance on change impact analysis, coupling and error handling.

Complete selected AMC and associated material, from PDF pages 416–430 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 421 · PDF page 421

Figure 1 — Legacy software process flow chart

Intent to use software previously shown to satisfy

Conduct a CIA.

ED-12, ED-12A, or ED-12B.

See 9(b)(4).

Evaluate software usage history, SDs, ADs, OPRs, etc.

See 9(b)(1).

Determine tool

Yes

Will there be new software tools or changes to tools?

qualification requirements. See Section 10.

See 9(b)(5).

No

No

Is the software usage history

Correct process deficiencies and document plan for

acceptable?

See 9(b)(1).

resolving related software deficiencies.

See 9(b)(1).

Yes

Yes

Did you upgrade the software baseline to ED-12C IAW paragraph

9(b)(2)(a), (b), or (c)?

See 9(b)(6).

No

Is the software developed using

No

ED-12B? See 9(b)(2).

No

Yes

If MBD, OOT, or FM will be used, do processes support

the technique IAW applicable

guidance? See 9(b)(7)(a).

Yes

Yes

Is the ED-12B software level

Is the ED-12 or ED-12A software level

Yes

acceptable?

acceptable?

See 9(b)(2).

See 9(b)(2).

No

No

No

Have the software plans and environment been

properly maintained?

Upgrade software baseline

See 9(b)(7)(b).

Upgrade software baseline

including all processes & procedures using ED-12B or use

including all processes & procedures using ED-12C

Yes

ED-12C and ED-215.

See 9(b)(2)(c).

and ED-215. See 9(b)(2)(a) or (b).

Yes

Do you want to declare equivalence to

ED-12C? See 9(b)(7)(c).

No

Upgrade software baseline

including all processes & procedures using ED-12C

Yes

and ED-215.

Is the legacy system software to be modified?

See 9(b)(9).

See 9(b)(3).

No

Change software and associated life cycle data using the same ED-12 version as the original

approval. For configuration data/PDI, use an approved process or

establish new process using ED-12C.

See 9(b)(8)(a) & (b).

Change software and associated life cycle data using ED-12C, Section 12.1, and applicable

Original approval basis or baseline upgrade to ED-12C acceptable as approval basis.

See 9(b)(3)(a) or (b).

supplements. See 9(b)(6) & (9).

Acronyms ADs — airworthiness directives CIA — change impact analysis FMs — formal methods IAW — in accordance with MBD — model-based development OOT — object-oriented technology OPRs — open problem reports PDI — parameter data item SDs — service difficulties

Note: references to RTCA documents are intentionally omitted for formatting purposes.

View figures, tables and original page layoutOriginal source page Source page 421 · PDF page 421 of AMC 20-115D

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-115D

Related technical context

Engineering context
Evidence and scope

AC 20-115D and AMC 20-115D — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.