AMC 20-115D
Airborne Software Development Assurance Using EUROCAE ED-12 and RTCA DO-178
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Airborne software development assurance; includes GM1, GM2 and GM3 to AMC 20-115D.
Aerospace Consulting reference note: Guidance for airborne software development assurance using ED-12/DO-178 and associated supplements, with the related guidance on change impact analysis, coupling and error handling.
Complete selected AMC and associated material, from PDF pages 416–430 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
4. the tools (e.g. when a new tool version is introduced or a tool’s use is modified);
5. the processor or other hardware components and interfaces;
6. the configuration data, especially when activating or deactivating functions;
7. the software interface characteristics and input/output (I/O) requirements; and
8. the software requirements, design, architecture, and code components, where such changes are not limited to the modified life cycle data, but should also consider the items affected by the change.
d. For each applicable item of subparagraph 13(c) above, a CIA describes the resulting impact of the change(s) and identifies the activities to be performed to satisfy ED-12C/DO-178C or ED- 12B/DO-178B and continue to satisfy the requirements for safe operation.
[Amdt 20/14]
GM2 to AMC 20-115D — Clarification of data coupling and control coupling
ED Decision 2017/020/R
These practices provide complementary information to ED-94C/DO-248C FAQ#67 for satisfying objective A-7 (8) of ED-12C/DO-178C and ED-12B/DO-178B.
a. Data coupling analysis is of a different type and purpose than control coupling analysis. Both analyses are necessary to satisfy said objective.
b. Although they support a verification objective, data coupling and control coupling analyses rely on good practices in the software design phase, for example, through the specification of the interfaces (I/O) and of the dependencies between components.
[Amdt 20/14]
GM3 to AMC 20-115D — Error-handling at design level
ED Decision 2017/020/R
a. These practices provide complementary information to ED-12C/DO-178C and ED-12B/DO-178B, Sections 6.3.2, 6.3.3, and 6.3.4. Section 6.3.4.f., and identifies potential sources of errors that require specific activities focused at the source code review level. However, in order to protect against foreseeable unintended software behaviour, it is beneficial and recommended to handle these sources of error at the design level.
b. The possibility of unintended software behaviour may be reduced by considering the following activities:
1. identification of foreseeable sources of software errors, which include:
a. runtime exceptions or errors, such as fixed/floating-point arithmetic overflow, stack/heap overflow, division by zero, or counter and timer overrun/wrap-around;
b. data/memory corruption or timing issues, such as those caused by a lack of partitioning or improper interrupt management or cache management; and
c. features leading to unpredictable programme execution, such as dynamic allocation, out-of-order execution, or resource contention;
2. for each foreseeable source of software error, identification of the associated mitigation;
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-115D and AMC 20-115D — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source