AC 21.101-1B
Establishing the Certification Basis of Changed Aeronautical Products
21.101-1B Source checked 2026-11-28
Scope, source and reading notes
Application of the changed product rule in §§ 21.101 and 21.19 to changes to type-certificated aeronautical products.
Aerospace Consulting reference note: Explains how to establish the certification basis for changed products, including significance determinations and use of earlier or later requirements.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 41e61c9dc800feaa6f358594becb92d6152d23efdbc0d466a883b05da4b0b590
1.4.1 This chapter clarifies the purpose of this AC, describes its content, specifies the intended audience affected by this AC, clarifies which changes are within the scope of this AC, and references the definitions and terminology used in this AC.
1.4.2 Chapter 2 provides a general overview of §§ 21.101 and 21.19, clarifies the main principles and safety objectives, and directs applicants to the applicable guidance contained in subsequent chapters of this AC.
1.4.3 Chapter 3 contains guidance for implementation of § 21.101(b) to establish the type certification basis for changed aeronautical products. It describes in detail the various steps for developing the certification basis, a process that applies to all major design changes to aeronautical products. Chapter 3 also addresses § 21.19 considerations for identifying conditions under which an applicant for a type design change is required to submit an application for a new TC and provides guidance at which stage of the process this assessment is performed.
1.4.4 Chapter 4 provides guidance about products excepted from the requirement of § 21.101.
1.4.5 Chapter 5 contains considerations for—
• Design-related operating requirements,
• Determining which policy to apply to a design change,
• Defining a baseline product,
• Predecessor regulations,
• Using special conditions under § 21.101(d),
• The effective period of application for a change to a TC under § 21.101(e),
• Other category aircraft under § 21.101(f),
• Clarification of § 21.101(g) regarding 14 CFR part 26 requirements,
• Documenting revisions to the TC basis,
• Incorporating STCs into the type design,
• Removing design changes,
• Determining a certification basis after removing an approved design change, and
• Sequential design changes.
1.4.6 Appendix A contains examples of typical type design changes for small airplanes, transport airplanes, rotorcraft, engines, and propellers. The Federal Aviation Administration (FAA) has categorized these examples into individual tables according to the classifications of design change—“substantial,” “significant,” and “not significant.”
1.4.7 Appendix B contains application charts for applying the § 21.101 process, including the excepted process.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.112A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source