Scope, source and reading notes

Application of the changed product rule in §§ 21.101 and 21.19 to changes to type-certificated aeronautical products.

Aerospace Consulting reference note: Explains how to establish the certification basis for changed products, including significance determinations and use of earlier or later requirements.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 41e61c9dc800feaa6f358594becb92d6152d23efdbc0d466a883b05da4b0b590

Source page 146 · PDF page 146

03/11/16 AC 21.101-1B Appendix G

APPENDIX G. CHANGED PRODUCT RULE DECISION RECORD

CHANGED PRODUCT RULE (CPR) DECISION RECORD

TC/STC No.: Click here to enter text. Project Number: Click here to enter text.

The proposed type design changes are identified here or in the following document(s): Click here to enter text.

Step 1: Identify the proposed type design changes to the aeronautical product. (See paragraph 3.2 of AC 21.101-1B)

Note: The Issue Paper process is used to track/document the decisions at Step 2 and Steps 5 through 8 as required.

☐ Yes New Type Certificate: Proceed to § 21.19. Section 21.101 does not apply. A G-1 issue paper will be used to establish and document the certification basis.

Step 2: Is the proposed type design change substantial? (See paragraph 3.3 of AC 21.101-1B)

☐ No Proceed to Step 3.

Step 3: Will you use the latest standards? (See paragraph 3.4 of AC 21.101-1B) ☐ Yes Latest Requirements: Propose a certification basis using the standards in effect at the date of application. Proceed to Step 8.

☐ No Proceed to Step 4.

Note: For multiple groupings, continuation of this process should be split into separate decision records. Groupings may be rationalized and recorded in separate documents: Click here to enter text.

Step 4: Arrange changes into related and unrelated groups. (See paragraph 3.5 of AC 21.101-1B)

☐ Yes Proceed to Step 6.

Step 5: Is each related or unrelated group a significant change? (See paragraph 3.6 of AC 21.101-1B)

☐ No Earlier Requirements: Propose a certification basis using the standards in effect before the date of application but not earlier than the existing certification basis. Certification basis to be defined and documented as indicated (below). Proceed to Step 8.

The Affected Area(s) are detailed here or in the following Certification Basis List document number(s): Click here to enter text.

Step 6: Prepare your Certification Basis List. (See paragraph 3.9 of AC 21.101-1B) Affected Areas:

Process and propose each applicable requirement individually. Proceed to Step 7.

Not Affected Areas: Existing Requirements: You may continue using the existing certification basis.

☐ Yes Latest Requirements: Propose a certification basis using the standards in effect on the date of application.

Step 7: Do the latest requirements contribute materially to the level of safety and are they practical? (See paragraph 3.10 of AC 21.101-1B)

☐ No Earlier Requirements: You may propose a certification basis using the standards in effect before the date of application but not earlier than the existing certification basis. Certification basis defined or documented as indicated below.

☐ Continuation Sheet(s) Attached Note: Several standards may apply to each affected area, and the assessment may differ from standard to standard. Indicate “Yes” if compliance with any latest standard(s) is required. Indicate “No” only if earlier standards are proposed.

Note: You may submit a proposal for the decision in Step 7; however, the FAA will make the final certification basis determination.

Step 8: Ensure the proposed certification basis is adequate. (See paragraph 3.11 of AC 21.101-1B)

If you deem that the certification basis is adequate, submit proposed certification basis to the FAA. If not, consult the FAA. A G-1 issue paper may be needed to document the certification basis.

Certification Basis: The certification basis is detailed here or in the following document(s): Click here to enter text.

Based on the information provided above, I am proposing the certification basis with the following classification for the type design change. (check one)

☐ Significant, pursuant to § 21.101. ☐ Not significant, pursuant to § 21.101.

Click here to enter text. Click here to enter text.

Printed Name/Title Signature Date

View figures, tables and original page layoutOriginal source page Source page 146 · PDF page 146 of AC 21.101-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.112A

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
AC 21-40A

Related technical context

Engineering context
Evidence and scope

AC 21-40A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.