AC 21.101-1B
Establishing the Certification Basis of Changed Aeronautical Products
21.101-1B Source checked 2026-11-28
Scope, source and reading notes
Application of the changed product rule in §§ 21.101 and 21.19 to changes to type-certificated aeronautical products.
Aerospace Consulting reference note: Explains how to establish the certification basis for changed products, including significance determinations and use of earlier or later requirements.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 41e61c9dc800feaa6f358594becb92d6152d23efdbc0d466a883b05da4b0b590
CHAPTER 3. PROCESS FOR ESTABLISHING THE CERTIFICATION BASIS FOR CHANGED PRODUCTS
3.1 Overview.
3.1.1 The applicant and the FAA each have a responsibility under § 21.101(a) and (b). As an applicant for the certification of a type design change, you must show that the change and areas affected by the change comply with the latest applicable airworthiness requirements unless you propose exception(s) under § 21.101(b). If you are proposing exception(s), you should make a preliminary classification whether the change is “significant” or “not significant,” and propose an appropriate certification basis. The FAA is responsible for determining whether your classification of the change, and proposal for the certification basis, are consistent with the applicable rules and their interpretation. The FAA determination does not depend on whether the TC holder or applicant for an STC is originating the change. The certification basis can vary depending on the magnitude and scope of the change. The steps below present a streamlined approach for making this determination.
3.1.2 The tables in appendix A of this AC are examples of classifications of typical type design changes. See paragraph 3.6.3 of this chapter for instructions on how to use those tables.
3.1.3 If your proposed change is not in the examples provided in appendix A, you may use the following steps in conjunction with the flowchart in figure 3-1 of this AC to develop the appropriate certification basis for the type design change. For clarification, the design change discussed in the flowchart also includes areas affected by the design change pursuant to § 21.101. See paragraph 3.9.1 of this AC for guidance about affected areas.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.112A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source