Application of the changed product rule in §§ 21.101 and 21.19 to changes to type-certificated aeronautical products.
Aerospace Consulting reference note: Explains how to establish the certification basis for changed products, including significance determinations and use of earlier or later requirements.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 41e61c9dc800feaa6f358594becb92d6152d23efdbc0d466a883b05da4b0b590
03/11/16 AC 21.101-1B Appendix E
E.3.3.3 Step 3: Review the History of the Consequences of the Hazard(s). There have been occurrences with injuries, with more than 10 percent deaths, less than 10 percent deaths, and no deaths.
E.3.3.4 Step 4: Identify the Historical and Predicted Frequency of Each Consequence. The 1998 Aviation Rulemaking Advisory Committee Fuel Tank Harmonization Working Group report documents the historical frequency of fuel tank explosions as 16, which caused a total of 539 fatalities.
There have been two additional fuel tank explosions since that report was issued:
• March 3, 2001—Thai Airways International Flight 114 experienced a fuel tank explosion on the ground that caused 1 fatality and 3 serious injuries. The explosion and subsequent fire destroyed the airplane.
• May 4, 2006—A Malaysia Airlines Boeing 727 experienced a wing tank low pressure explosion during ground operations. There was no fire and no injuries. The wing structure suffered significant damage.
There is no reason to believe that the future rate of accidents will be significantly different than the historical record if fuel tank system airworthiness limitations are not included in the ICA as is permitted in earlier amendment levels.
E.3.3.5 Step 5: Determine How Effective Full Compliance with the Latest Amendment of the Regulation would be at Addressing the Hazard. Considerable potential for eliminating or avoiding the hazard.
In the 2008 Fuel Tank Flammability Reduction (FTFR) rule, the FAA estimated compliance with the ignition prevention requirements of Amendment 25-102 together with the fuel tank ignition prevention airworthiness directives issued as a result of the Special Federal Aviation Regulation number 88 reviews resulted in the range of effectiveness in preventing fuel tank explosions between 25 to 75 percent with a median value of 50 percent (73 FR 42449).
E.3.3.6 Step 6: Determine Resource Costs and Cost Avoidance. Costs.
• For newly developed designs, there would be minor increases in costs resulting from identification and implementation of fuel tank system airworthiness limitations.
• There would be no increase in costs related to materials, operating costs, and revenue utility loss.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.112A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source