Scope, source and reading notes
Application of the changed product rule in §§ 21.101 and 21.19 to changes to type-certificated aeronautical products.
Aerospace Consulting reference note: Explains how to establish the certification basis for changed products, including significance determinations and use of earlier or later requirements.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 41e61c9dc800feaa6f358594becb92d6152d23efdbc0d466a883b05da4b0b590
03/11/16 AC 21.101-1B Appendix E
Costs
The accuracies of fleet size projections, utilization, etc., may be different than that experienced for derived product designs and must be validated.
• Labor: Work carried out in the design, fabrication, inspection, operation, or maintenance of a product for the purpose of incorporating or demonstrating compliance with a proposed action. Non-recurring labor requirements, including training, for the applicant supporting development and production of the product, should be considered.
• Capital: Construction of new, modified, or temporary facilities for design, production, tooling, training, or maintenance.
• Material: Cost associated with product materials, product components, inventory, kits, and spares.
• Operating Costs: Costs associated with fuel, oil, fees, training, and expendables.
• Revenue/Utility Loss: Costs resulting from earning/usage capability reductions from departure delays, product downtime, and performance loss due to seats, cargo, range, or airport restrictions.
• The cost of changing compliance documentation and/or drawings in itself is not an acceptable reason for an exception.
Cost Avoidance.
• Avoiding cost of accidents, including investigation of accidents, lawsuits, public relations activities, insurance, and lost revenue.
• Foreign Certification: Conducting a single effort that would demonstrate compliance to the requirements of most certifying Authorities, thus minimizing certification costs.
E.2.7 Step 7: Document the Conclusion. With the information from previous steps documented and reviewed, the applicant’s position and rationale regarding whether complying with the latest regulations contributes materially to the product’s level of safety or its practicality can be documented. The FAA records the determination of whether the conditions for the proposed exception were met. That determination is based on the information and analysis provided by the applicant in the preceding steps. If the determination to grant the exception is based on the product’s design features, those features are documented at a high level in the TCDS. Documentation in the TCDS is required so that the features are maintained during subsequent changes to the product, therefore, maintaining the product’s agreed level of safety. If the results of this analysis are inconclusive, then further discussions with the FAA are warranted.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.112A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 21-40A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source