FAA Advisory circularActive

AC 20-193

Use of Multi-Core Processors

20-193 Source checked 2026-11-28

Scope, source and reading notes

Multi-core processors in airborne systems and equipment used for type certification or technical standard order authorization; applicability and assurance objectives are defined in the AC.

Aerospace Consulting reference note: Addresses the assurance challenges of multi-core processor use, including interference channels, resource use, and compliance evidence.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f977071a2160ce1d14e831e70bdc363c1c62ded6c76cae09201e6d936a12bc02

Source page 11 · PDF page 11

The way in which the applicant should satisfy this objective depends on the type of the MCP platform:

• MCP platforms with robust partitioning:

Applicants who have verified that their MCP platform provides both robust resource partitioning and robust time partitioning (as defined in this document) may verify software applications separately on the MCP and determine their WCETs separately.

• All other MCP platforms:

Applicants may verify separately on the MCP any software component or set of requirements for which the interference identified in the interference analysis is mitigated or is precluded by design. Software components or sets of software requirements for which interference is not avoided or mitigated should be tested on the target MCP with all software components executing in the intended final configuration, including robustness testing of the interfaces of the MCP.

The WCET of a software component may be determined separately on the MCP if the applicant shows that time interference is mitigated for that software component; otherwise, the WCET should be determined by analysis and confirmed by test on the target MCP with all the software components executing in the intended final configuration.

NOTES:

a) All the interfaces between the hosted software and the hardware of the MCP should be included in this testing.

b) The robustness testing mentioned above is intended to cover the specific aspects of an MCP that are not specifically covered by the standard verification activities described in the applicable software guidance.

c) If the highest IDAL of the MCP hardware and of all the software applications hosted on the MCP is C and the hosted software applications are not required by the safety analysis to be robustly partitioned, then the applicant has the option to not conduct an interference analysis and therefore to not meet objective MCP_Resource_Usage_3. In such a case where no interference analysis has been performed, the hosted software components should be verified according to this objective as components for which interference is not avoided or mitigated and for which separate verification is therefore not permitted.

d) To “verify separately” and “determine the WCET separately” mean to conduct these activities without all the software executing at the same time on other cores of the MCP.

e) Interference may occur between tasks of a single component when the tasks execute on different cores.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-193

Related technical context

Engineering context
Evidence and scope

AC 20-193 and AMC 20-193 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.