AC 20-193
Use of Multi-Core Processors
20-193 Source checked 2026-11-28
Scope, source and reading notes
Multi-core processors in airborne systems and equipment used for type certification or technical standard order authorization; applicability and assurance objectives are defined in the AC.
Aerospace Consulting reference note: Addresses the assurance challenges of multi-core processor use, including interference channels, resource use, and compliance evidence.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f977071a2160ce1d14e831e70bdc363c1c62ded6c76cae09201e6d936a12bc02
1/8/24 AC 20-193
MCP_Resource_Usage_4:
The applicant has identified the available resources of the MCP and of its interconnect in the intended final configuration, has allocated the resources of the MCP to the software applications hosted on the MCP, and has verified that the demands for the resources of the MCP and of the interconnect do not exceed the available resources when all the hosted software is executing on the target processor.
NOTE: The use of worst-case scenarios is implicit in this objective.
5.5 Software verification.
5.5.1 The software verification processes in the applicable software guidance need to be adapted for use on an MCP to demonstrate that the hosted software applications function correctly and have sufficient time to execute in the presence of the interference that occurs when all the hosted software is executing on an MCP.
5.5.2 With an MCP, there may be data and control flows between software components or tasks hosted on different cores of the MCP. Therefore, the data and control coupling analysis performed on the software hosted on each separate core (as requested by the applicable software guidance) may not reveal the improper software behavior associated with features such as hardware runtime optimizations and memory models on MCPs.
5.5.3 The WCET of a software component or task may increase significantly when other software components or tasks are executing in parallel on the other cores of an MCP. This could cause some software applications to have insufficient time to complete the execution of their safety-critical functionality.
5.5.4 Interference and interactions between software applications or tasks occur via the proprietary internal mechanisms of an MCP. Any simulation of those mechanisms is therefore less likely to be representative in terms of functionality or execution time than testing conducted on the target MCP in the intended final configuration, and thus is less likely to detect errors.
5.5.5 To adapt the software verification guidance for different types of MCP platforms, the two following categories of MCP platforms are considered:
• MCP platforms with robust partitioning, and
• All other MCP platforms.
MCP_Software_1:
The applicant has verified that all the software components hosted by the MCP meet the objectives of the applicable software guidance. In particular, the applicant has verified that all the hosted software components function correctly and have sufficient time to complete their execution when all the hosted software and hardware of the MCP is executing in the intended final configuration.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-193 and AMC 20-193 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source