FAA Advisory circularActive

AC 20-193

Use of Multi-Core Processors

20-193 Source checked 2026-11-28

Scope, source and reading notes

Multi-core processors in airborne systems and equipment used for type certification or technical standard order authorization; applicability and assurance objectives are defined in the AC.

Aerospace Consulting reference note: Addresses the assurance challenges of multi-core processor use, including interference channels, resource use, and compliance evidence.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f977071a2160ce1d14e831e70bdc363c1c62ded6c76cae09201e6d936a12bc02

Source page 9 · PDF page 9

1/8/24 AC 20-193

5.4.2 There may be software or hardware channels through which the MCP cores or the software hosted on those cores could interfere with each other, in addition to those channels specifically mentioned in this AC. For instance, many MCPs include an “interconnect” or “coherency fabric”, through which the demands for MCP resources, e.g., from the software applications hosted on the MCP, are channeled and the demands are arbitrated. This arbitration can cause interference effects such as jitter on data arrival times, data consistency issues, or it can change the order in which transactions requested by the software applications are executed.

5.4.3 Non-deterministic behavior of the hosted software applications may occur due to such interference.

5.4.4 Moreover, the complexity of the MCP, executing tasks in parallel, and the interference could lead to the demands for resources exceeding the available resources. For instance, if the demands for interconnect transactions are very high in MCPs with a very high level of external databus traffic, the interconnect can become overloaded, which can affect transactions on some MCPs.

MCP_Resource_Usage_3:

The applicant has identified the interference channels that could permit interference to affect the software applications hosted on the MCP cores and has verified the applicant’s chosen means of mitigation of the interference.

NOTES:

a) This objective includes the identification of any interference caused by the use of shared memory, shared cache, an interconnect, or the use of any other shared resources, including shared peripherals, and the verification of the means of mitigation chosen by the applicant.

b) If the applicant identifies interference channels that cannot affect the software applications in the intended final configuration, then those interference channels do not need to be mitigated and no verification of mitigation is needed.

c) The applicant should handle any interference channel discovered at any time during the project in the same manner as in this objective and these explanatory notes.

d) If the highest IDAL of the MCP hardware and of all the software applications hosted on the MCP is C and the hosted software applications are not required by the safety analysis to be robustly partitioned, then the applicant has the option to not conduct an interference analysis and therefore to not meet this objective. However, applicants should note that opting to not meet this objective affects the way they are permitted to conduct their software verification. (See objective MCP_Software_1 and Note c) of that objective.)

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-193

Related technical context

Engineering context
Evidence and scope

AC 20-193 and AMC 20-193 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.