FAA / Advisory circular

AC 21.17-4

Type Certification—Powered-lift

Follow the FAA powered-lift certification approach and navigate the airworthiness criteria in Appendix A.

Start with the scope.

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page A-49

PDF page 58 of 64

Enlarge original ↗

Original source view; text reflow has not yet been reviewed

Original FAA AC 21.17-4, PDF page 58
AC 21.17-4 · A-49Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

07/18/2025                                               AC 21.17-4
                                                                        Appendix A

(a) Governing and reversible-pitch propellers. Fifteen hundred complete cycles must be made
across the range of forward pitch and rotational speed. In addition, 200 complete cycles of
control must be made from lowest normal pitch to maximum reverse pitch. During each cycle,
the propeller must run for 30 seconds at the maximum power and rotational speed selected by the
applicant for maximum reverse pitch.
(b) Feathering propellers. Fifty cycles of feather and unfeather operation must be made.
PL.3541 Overspeed and overtorque.
(a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant
must demonstrate that the propeller is capable of further operation without maintenance action at
the maximum propeller overspeed condition. This may be accomplished by:
(1) Performance of 20 runs, each of 30 seconds duration, at the maximum propeller overspeed
condition; or
(2) Analysis based on test or service experience.
(b) When the applicant seeks approval of a transient maximum propeller overtorque, the
applicant must demonstrate that the propeller is capable of further operation without maintenance
action at the maximum propeller overtorque condition. This may be accomplished by
performance of 20 runs, each of 30 seconds duration, at the maximum propeller overtorque
condition.
PL.3542 Components of the propeller control system.
The applicant must demonstrate by tests, analysis based on tests, or service experience on similar
components, that each propeller blade pitch control system component, including governors,
pitch change assem blies, pitch locks, mechanical stops, and feathering system components, can
withstand cyclic operation that simulates the normal load and pitch change travel to which the
component would be subjected during the initially declared overhaul period or during a
minimum of 1,000 hours of typical operation in service.
PL.3543 Propeller hydraulic components.
Applicants must show by test, validated analysis, or both, that propeller components that contain
hydraulic pressure and whose structural failure or leakage from a structural failure could cause a
hazardous propeller effect demonstrate structural integrity by:
(a) A proof pressure test to 1.5 times the maximum operating pressure for one minute without
permanent deformation or leakage that would prevent performance of the intended function.
(b) A burst pressure test to 2.0 times the maximum operating pressure for one minute without
failure. Leakage is permitted and seals may be excluded from the test.

SUBPART K—INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
PL.4101 General.
(a) This subpart specifies requirements for the preparation of Instructions for Continued
Airworthiness as required by PL.1529.


                                       A-49

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Begin with the aircraft and the agreed basis.

Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.

Explore our eVTOL safety and certification approach →
Source edition and reading coverage

64 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →