FAA / Advisory circular

AC 21.17-4

Type Certification—Powered-lift

Follow the FAA powered-lift certification approach and navigate the airworthiness criteria in Appendix A.

Start with the scope.

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page Feedback form

PDF page 64 of 64

Enlarge original ↗

Feedback form

Original FAA AC 21.17-4, PDF page 64
AC 21.17-4 · Feedback formOpen saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

    07/18/2025                                                                             OMB Control Number: 2120-0746
                                                                                                                                                                            Expiration Date: 12/31/2027
                         Advisory Circular Feedback Form

   Paperwork Reduction Act Burden Statement: A federal agency may not conduct or sponsor, and a person is not
    required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information
    subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a currently valid
  OMB Control Number. The OMB Control Number for this information collection is 2120-0746. Public reporting for this
    collection of information is estimated to be approximately 20 minutes per response, including the time for reviewing
     instructions, searching existing data sources, gathering, and maintaining the data needed, completing, and reviewing the
    collection of information.
    All responses to this collection of information are voluntary. Send comments regarding this burden estimate or any other
    aspect of this collection of information, including suggestions for reducing this burden to: Information Collection
    Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177-1524.
If you find an error in  this Advisory Circular, have recommendations for improving  it, or have
suggestions for new items/subjects to be added, you may let us know by emailing this form to 9-AWA-
AVS.AIR.DMO@faa.gov or faxing it to the attention of the LOB/SO at (202) 267-1813.

Subject: AC 21.17-4, Type-Certification-Powered-lift              Date:

Mark all appropriate line items:

  An error (procedural or typographical) has been noted in paragraph          on page                  .

  Recommend paragraph       on page     be changed as follows:



   In a future change to this AC, please cover the following subject:
   (Briefly describe what you want added.)



   Other comments:




    I would like to discuss the above. Please contact me using the information below.



Submitted by:                                       Date:





 FAA 1320-73 (01/25) SUPERSEDES PREVIOUS EDITIONS

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Begin with the aircraft and the agreed basis.

Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.

Explore our eVTOL safety and certification approach →
Source edition and reading coverage

64 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →