FAA / Advisory circular

AC 21.17-4

Type Certification—Powered-lift

Follow the FAA powered-lift certification approach and navigate the airworthiness criteria in Appendix A.

Start with the scope.

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page A-12

PDF page 21 of 64

Enlarge original ↗

Original source view; text reflow has not yet been reviewed

Original FAA AC 21.17-4, PDF page 21
AC 21.17-4 · A-12Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

07/18/2025                                               AC 21.17-4
                                                                        Appendix A

PL.2215 Flight load conditions.
(a) The applicant must determine the structural design loads resulting from the following flight
conditions:
(1) Atmospheric gusts where the magnitude and gradient of these gusts are based on measured
gust statistics.
(2) Symmetric and asymmetric maneuvers.
(3) Asymmetric thrust resulting from the failure of a propeller or engine.
(b) There must be no vibration or buffeting severe enough to result in structural damage, at any
speed up to dive speed, within the structural design envelope, in any configuration and power
setting.
PL.2220 Ground and water load conditions.
The applicant must determine the structural design loads resulting from taxi, takeoff, landing,
and handling conditions on the applicable surface in normal and adverse attitudes and
configurations.
PL.2225 Component loading conditions.
The applicant must determine the structural design loads acting on:
(a) Each engine mount and its supporting structure such that both are designed to withstand loads
resulting from—
(1) Powerplant operation combined with flight gust and maneuver loads; and
(2) For non-reciprocating powerplants, sudden powerplant stoppage.
(b) Each flight control and high-lift surface, their associated system and supporting structure
resulting from—
(1) The inertia of each surface and mass balance attachment;
(2) Flight gusts and maneuvers;
(3) Pilot or automated system inputs;
(4) System induced conditions, including jamming and friction; and
(5) Taxi, takeoff, and landing operations on the applicable surface, including downwind taxi and
gusts occurring on the applicable surface.
(c) A pressurized cabin resulting from the pressurization differential—
(1) From zero up to the maximum relief pressure combined with gust and maneuver loads;
(2) From zero up to the maximum relief pressure combined with ground and water loads if the
aircraft may land with the cabin pressurized; and
(3) At the maximum relief pressure multiplied by 1.33 for aircraft to be approved for operation to
45,000 feet or by a factor of 1.67 for aircraft to be approved for operation above 45,000 feet,
omitting all other loads.



                                       A-12

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Begin with the aircraft and the agreed basis.

Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.

Explore our eVTOL safety and certification approach →
Source edition and reading coverage

64 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →