FAA / Advisory circular

AC 21.17-4

Type Certification—Powered-lift

Follow the FAA powered-lift certification approach and navigate the airworthiness criteria in Appendix A.

Start with the scope.

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page A-11

PDF page 20 of 64

Enlarge original ↗

Original source view; text reflow has not yet been reviewed

Original FAA AC 21.17-4, PDF page 20
AC 21.17-4 · A-11Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

07/18/2025                                              AC 21.17-4
                                                                        Appendix A

(a) Structural design airspeeds, landing descent speeds, and any other airspeed limitation at
which the applicant must show compliance to the requirements of this subpart. The structural
design airspeeds must—
(1) Be sufficiently greater than the stalling speed of the aircraft to safeguard against loss of
control in turbulent air, while in wing-borne flight;
(2) Be sufficiently greater than the minimum speed of the aircraft while in thrust-borne and semi-
thrust-borne flight to safeguard against loss of control in turbulent air; and
(3) Provide sufficient margin for the establishment of practical operational limiting airspeeds.
(b) Design maneuvering load factors not less than those, which service history shows, may occur
within the structural design envelope.
(c) Inertial properties including weight, center of gravity, and mass moments of inertia,
accounting for—
(1) Each critical weight from the aircraft empty weight to the maximum weight; and
(2) The weight and distribution of occupants, payload, and energy-storage systems.
(d) Characteristics of aircraft control systems, including range of motion and tolerances for
control surfaces, high lift devices, or other moveable surfaces.
(e) Each critical altitude up to the maximum altitude.
(f) Engine-driven lift device rotational speed and ranges, and the maximum rearward and
sideward flight speeds.
(g) Thrust‐borne, wing‐borne, and semi‐thrust‐borne flight configurations, with associated flight
load envelopes.
PL.2205 Interaction of systems and structures.
For aircraft equipped with systems that modify structural performance, alleviate the impact of
this subpart's requirements, or provide a means of compliance with this subpart, the applicant
must account for the influence and failure of these systems when showing compliance with the
requirements of this subpart.
Structural Loads
PL.2210 Structural design loads.
(a) The applicant must:
(1) Determine the applicable structural design loads resulting from likely externally or internally
applied pressures, forces, or moments that may occur in flight, ground and water operations,
ground and water handling, and while the aircraft is parked or moored.
(2) Determine the loads required by paragraph (a)(1) of this section at all critical combinations of
parameters, on and within the boundaries of the structural design envelope.
(3) Determine the loads required for durability.
(b) The magnitude and distribution of the applicable structural design loads required by this
section must be based on physical principles.


                                       A-11

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Begin with the aircraft and the agreed basis.

Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.

Explore our eVTOL safety and certification approach →
Source edition and reading coverage

64 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →