FAA Transport Airplanes Issues List
Transport Airplanes Product Issues List
Q3 2026 · 30 September 2026 Source checked 2026-11-28
Scope, source and reading notes
Certification planning issues for domestic projects. Consult the applicable bilateral agreement for validation projects. Entries summarize issues and do not reproduce the underlying project issue papers. Public issue summaries only; complete project issue papers are not reproduced.
Aerospace Consulting reference note: Public certification topics that may require special conditions, agreed means of compliance or FAA coordination.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view. This is the FAA’s public summary of certification issues, not the full project issue papers.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6556493ec5bb833b574755ad8f2f5359a0acde15aee8fbdc4a10849dda339cea
T-2001 Transport Extended Operations (ETOPS)
Extended Operations (ETOPS) Type Design Requirements
Engine-Aircraft Interface Item. One or more issue papers may be needed to document means of compliance for the ETOPS design requirements in section K25.1 of appendix K to part 25, including, but not limited to: - Airplane System Safety Assessments for ETOPS - Human Factors for ETOPS - Airplane System Functions Required for a Maximum Length ETOPS Diversion - Icing Environmental Conditions, Icing Exposure and Ice Shapes for a Maximum Length ETOPS Diversion - Three Independent Electrical Power Source Requirement for ETOPS - ETOPS Low Fuel Alert - Auxiliary Power Unit Design - Configuration, Maintenance and Procedures (CMP) document - Airplane Flight Manual Requirements for ETOPS
T-2002 Transport Extended Operations (ETOPS)
Extended Operations (ETOPS) Service Experience Method
Engine-Aircraft Interface Item. One or more issue papers may be needed to document means of compliance for the ETOPS service experience method in appendix K to part 25 (section K25.2.1 for two-engine airplanes or section K25.3.1 for airplanes with more than two engines), including, but not limited to: - Compensating Factors for Reducing the Minimum Service Experience Required - Propulsion System and Airplane Systems Assessments for ETOPS - Airplane Flight Test for ETOPS
T-2003 Transport Extended Operations (ETOPS)
Early Extended Operations (ETOPS) Method
Engine-Aircraft Interface Item. One or more issue papers may be needed to document means of compliance for the Early ETOPS method in appendix K to part 25 (section K25.2.2 for two-engine airplanes or section K25.3.2 for airplanes with more than two engines), including, but not limited to: - Relevant Experience Assessment for Early ETOPS - Validation of Maintenance Procedures for ETOPS Significant Systems - Propulsion System Validation Test for Early ETOPS - New Technology Testing for Early ETOPS - Auxiliary Power Unit Validation Test for Early ETOPS - Early ETOPS Problem Tracking and Resolution System - Early ETOPS Acceptance Criteria, Design Maturity and Reliability Methods - Airplane Demonstration Flight Test for Early ETOPS
T-2004 Transport Extended Operations (ETOPS)
Combined Service Experience and Early Extended Operations (ETOPS) Method (i.e., Combined Method)
Engine-Aircraft Interface Item. One or more issue papers may be needed to document means of compliance for the combined service experience and Early ETOPS methods (i.e., combined method) in appendix K to part 25 (section K25.2.3 for two-engine airplanes or section K25.3.3 for airplanes with more than two engines), including, but not limited to: - Relevant Experience Assessment for Early ETOPS - Validation of Maintenance Procedures for ETOPS Significant Systems - Propulsion System Validation Test for Early ETOPS - New Technology Testing for Early ETOPS - Auxiliary Power Unit Validation Test for Early ETOPS - Early ETOPS Problem Tracking and Resolution System - Early ETOPS Acceptance Criteria, Design Maturity and Reliability Methods - Airplane Flight Test for ETOPS - Service Experience for Combined Service Experience and Early ETOPS Method (see Note) - Extending ETOPS Capability Using the Combined Service Experience and Early ETOPS Method (see Note) Note - These two issues may be combined into a single issue paper, if applicable.
View figures, tables and original page layout

