FAA Product issues listCurrent published list

FAA Small Airplanes Issues List

Small Airplanes Product Issues List

Q3 2026 · 30 September 2026 Source checked 2026-11-28

Scope, source and reading notes

Certification planning issues for domestic projects. Consult the applicable bilateral agreement for validation projects. Entries summarize issues and do not reproduce the underlying project issue papers. Public issue summaries only; complete project issue papers are not reproduced.

Aerospace Consulting reference note: Public certification topics that may require special conditions, agreed means of compliance or FAA coordination.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view. This is the FAA’s public summary of certification issues, not the full project issue papers.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 62751f1b8c1bedde2c69ffaeb2a9164653f8b95bb1349c12e16e00532257ddcc

Source page 7 · PDF page 7

A-0301 Small Airplane Avionics Non-TSO Electronic Flight Instrument Systems and Avionics

Standardization Item: If the applicant is seeking to install non-TSO avionics, then they may need to verify the level of FAA involvement in their project. Many avionics manufacturers have developed lower cost integrated display systems specifically for the Experimental and Amateur- built airplane markets. Although these systems have many or all of the same functions, they generally do not follow the design assurance processes specified in the TSOs. The TSOs only specify a minimum performance, and they often outline the design assurance requirements as well as environmental standards in addition to general operating requirements. TSO authorization indicates that the article manufacturer has provided a statement of compliance with the TSO requirements and the article is produced under an FAA approved quality system. For non-TSO equipment, the installer bears responsibility for supplier control of the type design and the production of the article. The FAA has issued several project-by-project policies that support the integration of such EFIS into part 23 airplanes. The FAA will determine their involvement for any EFIS that has not been certificated before.

A-0302 Small Airplane Avionics Relief from 14 CFR 23.1311(a)(5)

Standardization Item: If the applicant is seeking relief from 14 CFR part 23.1311(a)(5) at amendment 23-49 for installation approval of electronic displays in part 23 airplanes limited to VFR, then they may require an Equivalent Level of Safety (ELOS) finding. The FAA have developed policy designed to reduce the burden of processing multiple ELOS requests and communicates the intent of 23.1311(a)(5).

A-0303 Small Airplane Avionics Speech Recognition or Voice Activated Technology

If the applicant proposes to install speech recognition or voice activated technology for avionics data entry, then they may need to obtain an FAA accepted means of compliance (MOC) to 14 CFR 23.1301 and 23.1309 at amendment 23-63 and prior. At amendment 23-64 and after, applicants should incorporate FAA accepted means of compliance (MOC) into their certification planning.

A-0305 Small Airplane Avionics Vision Systems - Night Vision Imaging Systems

If the applicant is seeking to install night vision compatible lighting systems into part 23 airplanes, then they must obtain an FAA accepted means of compliance (MOC) at all amendment levels. The installation of night vision goggle compatible lighting systems for part 23 airplanes CPP is an accepted MOC. This MOC defines an acceptable MOC for aided flight operations and aided takeoff and landing operations. This MOC does not address operational authorization. The CPP does not currently allow for agricultural application operations and therefore an issue paper will be required. Similarly, aided seaplanes operations are also not covered and will require an issue paper.

A-0307 Small Airplane Avionics Airspeed Indicator Markings

Standardization Item: If the applicant is installing digital avionics (glass cockpit), then they may require an Equivalent Level Of Safety (ELOS) finding when complying with 14 CFR 23.1545 Airspeed Indicator at amendment 23-63 and prior. At amendment 23-64 and after, applicants should incorporate FAA accepted means of compliance (MOC) into their certification planning in lieu of an ELOS finding.

View figures, tables and original page layoutOriginal source page Source page 7 · PDF page 7 of FAA Small Airplanes Issues List