AMC 20-189
The Management of Open Problem Reports (OPRs)
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Management and assessment of open problem reports; includes GM1, GM2 and GM3.
Aerospace Consulting reference note: Explains the evaluation, classification and disposition of open problem reports in the certification process.
Complete selected AMC and associated material, from PDF pages 583–591 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
Item: a hardware or software element that has bounded and well-defined interfaces (source: ARP4754A/ED-79A).
Open problem report (OPR): a problem report that has not reached the state ‘Closed’ at the time of approval.
Problem report (PR): a means to identify and record the resolution of anomalous behaviour, process non-compliance with development assurance plans and standards, and deficiencies in life-cycle data (adapted from DO-178C/ED-12C).
Product: refer to Article 3(3) of Regulation (EU) 2018/1139 (the ‘EASA Basic Regulation’).
System: a combination of interrelated equipment, article(s), and/or items arranged to perform a specific function (or functions) within a product.
4.2. States of PRs/OPRs
Recorded: a problem that has been documented using the problem-reporting process.
Classified: a problem report that has been categorised in accordance with an established classification scheme.
Resolved: a problem report that has been corrected or fully mitigated, for which the resolution of the problem has been verified but not formally reviewed and confirmed.
Closed: a resolved problem report that underwent a formal review and confirmation of the effective resolution of the problem.
4.3. Classifications of PRs/OPRs
‘Significant’: assessed at the product, system, or equipment level, a PR that has an actual or potential effect on the product, system, or equipment function that may lead to a Catastrophic, Hazardous or Major failure condition, or may affect compliance with the operating rules.
‘Functional’: a PR that has an actual or a potential effect on a function at the product, system, or equipment level.
‘Process’: a PR that records a process non-compliance or deficiency that cannot result in a potential safety, nor a potential functional, effect.
‘Life-cycle data’: a PR that is linked to a deficiency in a life-cycle data item but not linked to a process non-compliance or process deficiency.
5. PROBLEM REPORT MANAGEMENT
The PR management process is a key enabler for the management of OPRs. The PR management process enables the consistent and timely management of problems encountered across the system, software and AEH domains. Consequently, this process reduces the risk of a loss of visibility of critical issues remaining at the time of approval.
5.1 A PR management process across the system, software and AEH domains should be established and used during the development (both for initial certification and subsequent changes) of a product or an ETSO article. The PR management process should address the review and resolution of PRs that impact the transition to other development assurance processes.
5.2 A problem recorded after approval should also be managed through the PR management process, and any related systemic process issues should be identified and corrected.
5.3 PRs that cannot be resolved by the current stakeholder should be reported in a manner that is understandable to the affected stakeholders.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-189 and AMC 20-189 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source