AC 23.2010-1
FAA Accepted Means of Compliance Process for 14 CFR Part 23
23.2010-1 Source checked 2026-11-28
Scope, source and reading notes
Process for submitting proposed means of compliance for FAA acceptance under § 23.2010, including type certification and changes using Part 23 standards.
Aerospace Consulting reference note: Explains how applicants propose and obtain acceptance of means of compliance under performance-based Part 23.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 86c5781e20a82a9235d5a05214813df478b604698d80b8a955057103d87491be
If you find an error in this AC, have recommendations for improving it, or have suggestions for new items/subjects to be added, you may let us know by (1) completing the form online at to https://ksn2.faa.gov/avs/dfs/Pages/Home.aspx or (2) emailing this form to 9-AWA-AVS-AIR- DMO@faa.gov.
Subject: AC 23.2010 Date:
Please check all appropriate line items:
☐ An error (procedural or typographical) has been noted in paragraph on page .
☐ Recommend paragraph on page be changed as follows:
☐ In a future change to this AC, please cover the following subject: (Briefly describe what you want added.)
☐ Other comments:
☐ I would like to discuss the above. Please contact me.
Submitted by: Date:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 23.2010-1 and CS-23 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source