AC 23.2010-1
FAA Accepted Means of Compliance Process for 14 CFR Part 23
23.2010-1 Source checked 2026-11-28
Scope, source and reading notes
Process for submitting proposed means of compliance for FAA acceptance under § 23.2010, including type certification and changes using Part 23 standards.
Aerospace Consulting reference note: Explains how applicants propose and obtain acceptance of means of compliance under performance-based Part 23.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 86c5781e20a82a9235d5a05214813df478b604698d80b8a955057103d87491be
6.2 Applicants should list the means of compliance they intend to use to show compliance to part 23 regulations in a certification plan or compliance checklist. The current edition of Order 8110.4, Type Certification, describes certification plans and compliance checklists.
6.3 When seeking acceptance of a means of compliance to all of part 23 or just one section, an applicant should propose to the Project Aircraft Certification Office (PACO) a means of compliance that meets the intent of each applicable amendment 23-64 or subsequent performance-based regulation. The proposal should be presented in the certification plan or compliance checklist as described in the latest revision of Order 8110.4.
6.4 The FAA does not provide new or alternative means of compliance documents provided by applicants to third parties unless specifically authorized by the applicant. The applicant may wish to consider offering its new or alternative means of compliance to a consensus standards body for inclusion as part of an industry developed consensus standard.
6.5 If new or alternative means of compliance are proposed, applicants should carefully consider the additional time and effort that could be necessary to coordinate a new or alternative means of compliance when scheduling their projects. FAA coordination may require the efforts of FAA technical specialists, Chief Scientific Technical Advisors, and other governmental agencies. The use of existing accepted means of compliance may be more expeditious.
6.6 An applicant may propose a new or alternative means of compliance to an existing accepted means of compliance. In such cases:
6.6.1 The applicant’s proposal should identify the portions of the means of compliance from which it will deviate and provide an alternative means along with the rationale as to why it demonstrates compliance with the intent of the part 23 performance-based regulation.
6.6.2 The PACO will review the applicant’s proposal to determine if the proposal should be presented to the Small Airplane Directorate for standardization purposes. The PACO should review and address the Small Airplane Issues List (previously known as the Significant Project List or SPL) for aspects or technology that may necessitate directorate involvement. In determining whether an issue paper is necessary, the PACO should consider—
6.6.2.1 Past engineering practices;
6.6.2.2 The technical quality of the proposal to demonstrate compliance with the intent of the part 23 regulations;
6.6.2.3 The technical ability of the applicant;
6.6.2.4 Controversial aspects;
5
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 23.2010-1 and CS-23 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source