AC 20-166A
Issue Paper Process
20-166A Source checked 2026-11-28
Scope, source and reading notes
Applicant guidance on issue papers for type certification, type validation, TSO authorization, parts approvals, and related certification activities.
Aerospace Consulting reference note: Explains the applicant role in identifying, documenting, and resolving significant certification issues through the FAA issue-paper process.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f143ca9ce46598aa889d1ef667d124fbba2dd53ac5ab2bc68f701511cb23ae13
Figure 1. Issue Paper Process Flow Chart
THE ISSUE PAPER PROCESS This Process Applies to Type Certification, Type Validation, PMA, TSOA, and 14 CFR 21.8(d) Projects.
Entry Point
FAA Coordination, Approval and Transmittal Sub-Process.
A
Originator
The project manager, ACO specialists, accountable directorate standard staff, OMT(including DSCO), or the project officer can make decision to generate issue paper for significant technical, regulatory, or administrative issue.
Program/Project Manager (PM)
Enter general info., statement of issue, and background. (Stage 1)
Obtain concurrence from the ACO, transmit issue paper to project officer.
A
Program/Project Manager (PM)
Originator
Enter FAA position. (Stage 2)
Obtain concurrence, as needed, from AEG, MIDO, AIR-100 and CSTAs.
A
Project Officer (PO)
Project Officer (PO)
Originator or PM Originator or PM
Coordinate revisions with the PM.
Provide regulatory/policy input and route the issue paper through the accountable directorate’s specialists and managers.
Coordinate with applicant and obtain applicant position. (Stage 3)
Discuss and clarify FAA position with applicant and foreign CA (if applicable). Also update issue paper with new positions as necessary.
Yes
A
Need issue paper revision?
No
No
Agreement reached?
Project Officer (PO)
Yes
PM
Obtain directorate approval and transmit approved issue paper to PM who transmits the issue paper to the applicant.
Originator or PM
Transmit to applicant and foreign CAA (if applicable).
Return to process
Develop Conclusion. (Stage 4)
PM
A
Note: The FAA coordination, approval and transmittal sub-process is mandatory prior to sending an issue paper to an applicant.
Place results (background, issue, conclusion) in official project file.
END
10
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-166A and AC 20-174 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source