FAA / Advisory circular

AC 21.17-4

Type Certification—Powered-lift

Follow the FAA powered-lift certification approach and navigate the airworthiness criteria in Appendix A.

Start with the scope.

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page A-26

PDF page 35 of 64

Enlarge original ↗

Original source view; text reflow has not yet been reviewed

Original FAA AC 21.17-4, PDF page 35
AC 21.17-4 · A-26Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

07/18/2025                                               AC 21.17-4
                                                                        Appendix A

PL.2703 IFR flight envelope.
The applicant must determine an approved IFR flight envelope specifically for operations for
flight into IFR conditions. If the approved IFR flight envelope differs from the approved flight
envelope, then the applicant must use instrument flight speeds to comply with this subpart.
PL.2705 Definitions.
(a) VYI means instrument climb speed, utilized instead of VY for compliance with the climb
requirements for instrument flight, if different than climb speed as defined in PL.2120.
(b) VMINI means instrument flight minimum speed, utilized in complying with minimum limit
speed requirements for instrument flight, if different than the flight profiles established under
PL.2110.
(c) A practical flight envelope means a flight envelope where, in the event of flight control,
propulsive, or stability augmentation malfunctions, compliance with controllability and
maneuverability requirements must be demonstrated.
PL.2707 Trim.
The aircraft must meet the requirements in PL.2140 for all approved IFR airspeeds, power
settings, and configurations appropriate to the type.
PL.2709 Stability and handling qualities.
The aircraft must meet the requirements in PL.2145 for the approved IFR airspeeds, power
settings, and configurations appropriate to the type.
PL.2711 Stability augmentation.
For any failure or combination of failures not shown to be extremely improbable, the aircraft
must be capable of continued safe flight and landing. In addition—
(a) The aircraft must remain safely controllable when the failure or malfunction occurs within the
approved IFR flight envelope; and
(b) The overall flight characteristics must allow for prolonged flight without undue pilot effort.
Additional unrelated probable failures affecting the control system must be considered. In
addition—
(1) The controllability, maneuverability, and stability requirements in subpart B must be met
throughout a practical flight envelope; and
(2) The flight control, trim, and flying qualities must not be reduced below that needed for
continued safe flight and l anding.
PL.2713 Equipment, systems, and installation.
The basic equipment and installation must comply with PL.2500, PL.2505, PL.2510, PL.2525
and PL.2615, with the following additions:
(a) Instrument systems and other systems essential for IFR flight that could be adversely affected
by icing must be adequately protected when exposed to atmospheric icing conditions.
(b) For each instrument essential for instrument flight—


                                       A-26

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Begin with the aircraft and the agreed basis.

Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.

Explore our eVTOL safety and certification approach →
Source edition and reading coverage

64 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →