EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-136A

Aircraft Electrical and Electronic System Lightning Protection

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Aircraft electrical and electronic system lightning protection, including both appendices.

Aerospace Consulting reference note: Provides guidance for assessing lightning effects, assigning protection levels and demonstrating protection of aircraft electrical and electronic systems.

Complete selected AMC and associated material, from PDF pages 464–496 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 484 · PDF page 484

8. STEPS TO ‘LEVEL B’ AND ‘LEVEL C’ SYSTEM LIGHTNING COMPLIANCE

Figure 3 illustrates a process that the applicant can use to demonstrate that their Level B and Level C systems comply with CS 23.1306(b)/2515(b), 25.1316(b), 27.1316(b), and 29.1316(b).

a. Step 1 — Identify Level B and Level C systems

1. The applicant should identify their Level B and Level C systems as described in paragraph 6(c).

2. The applicant should define the detailed system performance pass/fail criteria. The applicant should obtain the Agency’s concurrence on this criterion before starting tests or analyses of Level B and C systems.

b. Step 2 — Define system lightning protection. The applicant should define the lightning protection features incorporated into the system designs applicable to Level B and Level C systems. The design of equipment and system lightning protection may occur before aircraft-level tests are performed, and before the actual internal lightning environment is determined. Therefore, the equipment system lightning protection design should be based on an estimate of the expected internal lightning environment.

c. Step 3 — Establish the ETDLs

1. The applicant may use the ATLs determined during aircraft-level tests or analyses performed for Level A systems to establish the appropriate ETDLs for Level B and Level C systems.

2. Alternatively, the applicant may use the definitions in EUROCAE ED-14G Section 22 to select the appropriate ETDLs for their Level B and Level C systems. The following should be considered when selecting an appropriate level:

(a) The applicant can use EUROCAE ED-14G Section 22 Level 3 for most Level B systems.

(b) For Level B systems and the associated wiring installed in aircraft areas with more severe lightning transients, the applicant can use EUROCAE ED-14G Section 22 Level 4 or 5, as appropriate to the environment. Examples of aircraft areas with more severe lightning transients are those external to the fuselage, areas with composite structures showing poor shielding effectiveness, and other open areas.

(c) The applicant should use EUROCAE ED-14G Section 22 Level 2 for most Level C systems.

(d) For Level C systems installed in aircraft areas with more severe lightning transients, the applicant should use EUROCAE ED-14G Section 22 Level 3. Examples of aircraft areas with more severe lightning transients are those external to the fuselage, areas with composite structures showing poor shielding effectiveness, and other open areas.

(e) The applicant should provide the Agency with a description of their aircraft and system installation features to substantiate the EUROCAE ED-14G Section 22 levels selected for their system.

d. Step 4 — Select the ETDL verification method. The applicant should determine whether they will perform equipment lightning tests on the Level B and Level C systems, or whether they will base the compliance on previous equipment tests performed for a similar system.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-136C

Related technical context

Engineering context
Evidence and scope

AC 20-136C and AMC 20-136A — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.