EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-136A

Aircraft Electrical and Electronic System Lightning Protection

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Aircraft electrical and electronic system lightning protection, including both appendices.

Aerospace Consulting reference note: Provides guidance for assessing lightning effects, assigning protection levels and demonstrating protection of aircraft electrical and electronic systems.

Complete selected AMC and associated material, from PDF pages 464–496 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 474 · PDF page 474

h. Verify compliance with the applicable specifications

1. The applicant should demonstrate that the systems comply with the applicable specifications of CS 23.1306/2515, 25.1316, 27.1316, and 29.1316.

2. The applicant should demonstrate that the ETDLs exceed the ATLs by the margin established in their certification plan.

3. Verification may be accomplished by tests, analyses, or by demonstrating similarity to previously certified aircraft and systems. The certification process for Level A systems is contained in Section 7. The certification process for Level B and Level C systems is contained in Section 8.

4. The applicant should submit their compliance plan in the early stages of the programme to the Agency for review (see details in paragraph 7(a)). Experience shows that, particularly with aircraft using new technology or those that have complex systems, early agreement on the compliance plan benefits the certification of the product. The plan should define acceptable ways to resolve critical issues during the certification process. Analyses and test results during the certification process may warrant modifications to the design or verification methods. When significant changes are necessary, the certification plan should be updated accordingly.

i. Take corrective measures (if needed)

If tests and analyses show that the system did not meet the pass/fail criteria, review the aircraft, installation or system design and improve protection against lightning.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-136C

Related technical context

Engineering context
Evidence and scope

AC 20-136C and AMC 20-136A — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.