AC 25.1329-1C
Approval of Flight Guidance Systems
25.1329-1C — Changes 1–2 incorporated (2026-02-13) Source checked 2026-11-28
Scope, source and reading notes
Flight-guidance-system compliance under § 25.1329 for transport category airplanes; includes autopilots, flight directors, automatic thrust control, and associated interactions. Base publication catalog date: 2014-10-27; latest included change: 2026-02-13.
Aerospace Consulting reference note: Guidance for flight-guidance design and approval, incorporating Changes 1 and 2, including 2026 clarifications concerning disengagement alerts, override hazards, and incompatible modes.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: d1122e89d61663cc44456dd1ebff460127469027d8d667b0fd695bc8436357e0
AC 25.1329-1C CHG 2
3 If significant autopilot inputs are required to compensate for the icing conditions, then the acceptability of the indication of a significant out-of-trim condition should be assessed, and the subsequent response of the airplane when the autopilot disengages (manual or automatic) should be determined. For more information, see Chapter 3, paragraph 27.b, and Chapter 4, paragraph 45.d of this AC.
(b) De-icing. If the airplane is configured with a de-icing system, the autopilot should demonstrate satisfactory performance during the shedding of ice from the airplane.
(c) AFM limitations. Where degradation is noted that is not significant enough to require changes to the autopilot system or to de-icing or anti-icing systems, appropriate limitations and procedures should be established and presented in the AFM.
(2) Low-speed protection. The FGS should be assessed for the acceptability of the low-speed protection performance under the following conditions:
(a) High altitude cruise with a simulated engine failure.
(b) Climb to altitude capture at low altitude with a simulated engine failure during capture.
(c) Vertical speed with insufficient climb power.
(d) Approach with speed abuse.
(3) High-speed protection. The FGS should be assessed for the acceptability of the high-speed protection performance under the following conditions:
(a) High altitude level flight with autothrust function.
(b) High altitude level flight without autothrust function.
(c) High altitude descending flight with autothrust function.
(4) Go-around.
(a) Mode assessment. The objective of the Go-Around mode (see Chapter 6, paragraph 65.b, Go-Around Mode, of this AC) is to quickly change the flight path of the airplane from approach to landing to a safe climbout trajectory. The mode has specific utility in low- visibility conditions when operations are predicated on a DA(H), and a go-around is necessary if visual references are not acquired at the DA(H). Therefore, the assessment of the Go-Around mode may be conducted in conjunction with the evaluation of the FGS to support low-visibility operations, using additional criteria contained in AC 20-191.
(b) Flight evaluation. The flight evaluation should be conducted to assess the rotation characteristics of the airplane and the performance of the airplane in acquiring and maintaining a safe flight path. The acceptability of the operation if contact is made with the runway during the missed approach or balked landing should be established.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 25.671-1 and AC 25.1329-1C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source