Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
07/18/2025 AC 21.17-4
Appendix A
PL.2415 Powerplant ice protection.
(a) The aircraft design, including the inlet system, must prevent foreseeable accumulation of ice
or snow that adversely affects powerplant operation.
(b) The powerplant installation design must prevent any accumulation of ice or snow that
adversely affects powerplant operation, in those icing conditions for which certification is
requested.
PL.2425 Powerplant operational characteristics.
(a) Each installed powerplant must operate without any hazardous characteristics during normal
and emergency operation within the range of operating limitations for the aircraft and the engine.
(b) The design must provide for the shutdown and restart of the powerplant in flight within an
established operational envelope.
PL.2430 Energy system.
(a) The energy system must—
(1) Be designed and arranged to provide independence within the system, so that failure of any
one component will not result in unacceptable loss of energy supply;
(2) Be designed to prevent catastrophic events due to lightning strikes, taking into account direct
and indirect effects on the aircraft;
(3) Provide the energy necessary to ensure each powerplant functions properly in all likely
operating conditions;
(4) Provide the flightcrew with a means to determine the total useable energy available and
provide uninterrupted supply of that energy when the system is correctly operated, accounting
for likely energy fluctuations;
(5) Provide a means to safely remove or isolate the energy stored in the system from the aircraft;
and
(6) Be designed to retain energy under all likely operating conditions and to minimize hazards to
occupants and first responders following an emergency landing or otherwise survivable impact
(crash landing).
(b) Each energy-storage system must—
(1) Withstand the loads under likely operating conditions without failure; and
(2) Be isolated from personnel compartments and protected from likely hazards.
(c) Each energy-storage recharging system must be designed to—
(1) Prevent improper recharging; and
(2) Prevent the occurrence of hazard to the aircraft or to persons during recharging.
PL.2440 Powerplant fire protection.
There must be means to isolate and mitigate hazards to the aircraft in the event of a powerplant
system fire or overheat in operation.
SUBPART F—EQUIPMENT
A-21
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Begin with the aircraft and the agreed basis.
Connect the operating concept, aircraft-level failure effects, system architecture and assurance planning. Keep FAA powered-lift criteria and EASA SC-VTOL provisions distinct when developing the safety and certification approach.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.