Case study · Rotorcraft flight controls

Does the evidence cover
the requirement?

A review of verification coverage for a complex flight control system, connecting the requirement, the test approach and the configuration being claimed.

Anonymised technical work. No client identity or confidential programme material is reproduced.

The engineering question

A completed test is only part of the picture.

A verification result needs to be read against the requirement it supports. The important questions include what was physically tested, what was simulated and whether the tested configuration represents the design baseline.

Our contribution was to follow those connections and make the limits of the evidence visible to the engineering team.

Our contribution

Follow the claim all the way through.

Requirement coverage

Follow the requirement into the verification approach and identify the behaviour and conditions the evidence actually addresses.

Test representation

Distinguish physical testing from simulated elements, and examine the assumptions that connect the two.

Configuration

Check the relationship between the tested configuration and the design baseline being claimed.

Work products

Clear comments.
Specific next actions.

Technical review comments, requirement coverage questions, configuration checks and actions to close evidence gaps.

The value of the review: making partial coverage, unsupported assumptions and the need for further analysis or testing visible before the evidence is treated as complete.

This describes the technical contribution. It does not claim a certification outcome or delegated approval.

Illustrative review prompt

What is the test result telling us?

Which part of the requirement does this evidence support, under which conditions, and what remains to be demonstrated?

A recreated example of the review question, not an extract from a client report.

Have a similar question?

Bring the requirement.
Bring the uncertainty.

Tell us the system, development stage and evidence you need to review. We can agree a focused review or a defined work package.

Discuss a verification review

The email opens for you to review before sending. Keep the first message at project level.