14 CFR · AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT

§ 27.67

Climb: one engine inoperative.

Text as of November 12, 2026

For multiengine helicopters, the steady rate of climb (or descent), at Vy (or at the speed for minimum rate of descent), must be determined with—

(a) Maximum weight;

(b) The critical engine inoperative and the remaining engines at either—

(1) Maximum continuous power and, for helicopters for which certification for the use of 30-minute OEI power is requested, at 30-minute OEI power; or

(2) Continuous OEI power for helicopters for which certification for the use of continuous OEI power is requested.

(Secs. 313(a), 601, 603, 604, and 605 of the Federal Aviation Act of 1958 (49 U.S.C. 1354(a), 1421, 1423, 1424, and 1425); and sec. 6(c) of the Dept. of Transportation Act (49 U.S.C. 1655(c)))

[Doc. No. 5074, 29 FR 15695, Nov. 24, 1964, as amended by Amdt. 27-23, 53 FR 34210, Sept. 2, 1988]

About this text

Source: OFR/GPO eCFR. The wording is reproduced from the dated source, with formatting adapted for reading. The eCFR is an editorial compilation and is not the official legal edition of the CFR.

Check the latest eCFR text →

Working through a system safety question?

Bring the system, the certification basis and the issue your team needs to resolve.

Discuss your programme →