14 CFR · AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES

§ 25.1438

Pressurization and pneumatic systems.

Text as of November 12, 2026

(a) Pressurization system elements must be burst pressure tested to 2.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.

(b) Pneumatic system elements must be burst pressure tested to 3.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.

(c) An analysis, or a combination of analysis and test, may be substituted for any test required by paragraph (a) or (b) of this section if the Administrator finds it equivalent to the required test.

[Amdt. 25-41, 42 FR 36971, July 18, 1977]

About this text

Source: OFR/GPO eCFR. The wording is reproduced from the dated source, with formatting adapted for reading. The eCFR is an editorial compilation and is not the official legal edition of the CFR.

Check the latest eCFR text →

Working through a system safety question?

Bring the system, the certification basis and the issue your team needs to resolve.

Discuss your programme →